Ashland Circle Bulkhead Replacement
|
Project Description: Approximately 100 feet of bulkhead at the southern end of Ashland Circle will be replaced. The bulkhead, including a portion located on Hampton Roads Sanitation District property, will be raised 1.5-2 feet above the existing bulkhead. Additional work includes installing new wrought iron fencing, replacing sidewalk and curbing, replacing asphalt pavement,and installing a concrete storm pipe and landscaping. Project Status: Construction Project Cost: $440,000 Completion Date: Summer 2012 Project Manager: Wayne Webster Neighborhoods Affected: Lafayette, Winona Location: Ashland Circle |
||
| Planning Districts | Design Architect/Engineer | Construction Contractor | Sponsoring Department/Contact |
Lafayette |
TJ Crooks |
Environmental Storm Water |