Conoga and Cypress Streets Drainage Improvements
|
Project Description: This project includes the installation of 19 storm water inlets and approximately 1,800 linear feet of storm drainage pipe to help address flooding. Project Status: Design Project Cost: $776,000 Completion Date: Winter 2012 Project Manager: Chris Chambers Neighborhoods Affected: Campostella Location: Cypress Street from Selden Avenue to Conoga Street; Conoga Street from Cypress Street to the entrance to Norfolk Commons. Traffic Notes: Some lane closures are expected, but through traffic should be maintained. |
||
| Planning Districts | Design Architect/Engineer | Construction Contractor | Sponsoring Department/Contact |
Campostella |
TBD |
Environmental Storm Water |