An Erosion and Sediment ("E&S") Control Plan must be submitted and a permit granted before any land disturbing activity greater than 2,500 square feet can occur. A land disturbing activity is: any land change, including but not limited to, clearing, grading, excavating, transporting and filling of land, or other construction activities which would disturb the natural vegetation or the existing contours of the land, which may result in soil erosion from water or wind and the movement of sediments.
Location:
5th Floor, Room 501, City Hall Building,
Department of Planning and Community Development, 810 Union Street, Norfolk,
VA 23510
Contact:
Bureau of Environmental Services
Telephone: (757) 664-4368
Facsimile: (757) 664-4370
Requirements:
An Erosion and Sediment Control Plan including such items as:
Procedure:
Time Frame:
Up to 2 weeks for plan review
Fees:
None
Other:
Erosion permits are not required for the following: home
gardens; individual home landscaping, maintenance or repairs; individual service
connections; septic tank lines or drainage (except within the Chesapeake Bay
Preservation Area); railroad track maintenance; disturbed land areas of less
than 2,500 square feet in size; emergency work and repairs to protect life, limb
or property; installation of sign posts or poles.