CIP Projects
Active or recently completed Public Works, Utilities and VDOT projects
Select the First Letter of the Project
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AB
- Bayview Water and Sewer Upgrade Phase 3 (Utilities)
- Bayview - Cottage Line Water and Sewer Replacement Phase 4 (Utilities)
- Bayview and Cottage Line Water and Sewer PS23 Service Area PER (Utilities)
- Bayview and Cottage Line Water and Sewer PS23 Service Area PH1 (Utilities)
- Bluestone Area Gas Line Renewal (VNG)
- Botetourt Street Wastewater Pump Station 151 Design (Utilities)
C
- Cape Henry Avenue Drainage Improvements
- Chesterfield Heights Sanitary Sewer Upgrade Phase 1B (Utilities)
- Chesterfield Heights Wastewater Pump Station Phase 1A (Utilities)
- Coleman Place Drainage Improvements
- Colonial Place/Riverview Area Pipeline Replacement (HRSD)
- Conoga and Cypress Streets Drainage Improvements
- Consolidated Courts Complex
- Cross Town Connector Water Main Revised (Utilities)
D
- Downtown Tunnel Ceiling Panel Replacement (VDOT)
- Downtown Tunnel/Midtown Tunnel/MLK Extension (VDOT)
E
- East Little Creek Road and Tidewater Drive Underpass Reconstruction
- East Ocean View PS88 Phase 1 (Utilities)
F
- Fairmount Park Phase 8 (Utilities)
- Fairmount Park Phase 9 (Utilities)
- Fairmount Park Phase 10 (Utilities)
- 15th View and Lea View Avenues pump
- Fort Norfolk - Brambleton and Colley Aves
- Fort Norfolk - Southampton Ave
- 44th Street Area Gas Line Renewal (VNG)
G
H
- Half Moone Cruise and Celebration Center Mooring Dolphin
- Hampton Boulevard Grade Separation (VDOT)
- Harrell Avenue Culvert Replacement
- Haven Creek Living Shoreline
- Huntersville Water and Sewer Replacement Phase 5 (Utilities)
I
- I-264/I-64 Interchange Improvements (VDOT)
- I-564 Intermodal Connector (VDOT) *Project Map*
- I-564 Water Main (Utilities)
- I-64/Norview Ramp Improvements (VDOT)
- Ingleside Gym
J
K
L
- Lake Wright East (Northampton Boulevard Roadway Modifications)
- Lamberts Point Shoreline Protection Project
- Lea View and 15th View pump
- Lindenwood Water and Sewer Replacement Phase 4 (Utilities)
- Little Creek Road and Tidewater Drive Underpass Reconstruction
- Lochaven and Larchmont Wastewater PS109 Flood Control Design (Utilities)
- Lochaven and Larchmont Wastewater PS112 Flood Control Design (Utilities)
- Lochaven and Larchmont Wastewater PS113 Flood Control Design (Utilities)
- Lochaven and Larchmont Wastewater PS114 Flood Control Design (Utilities)
- Lowery Road Signal
M
- Mason Creek Culvert Replacement
- Midtown Tunnel/Downtown Tunnel/MLK Extension (VDOT)
- Military Highway Widening (VDOT)
- Military Highway Pipeline Condition Assessment (HRSD)
- Monticello Avenue and 26th Street Signal Improvements
- Moores Bridges WTP Upgrades (Utilities)
- Morton Avenue Area Gas Line Renewal (VNG)
- Mowbray Arch Water and Sanitary Sewer Construction Phase 1 (Utilities)
- Mowbray Arch Water and Sanitary Sewer Design Phase 2 (Utilities)
N
- Newtown Road Water Main Improvements (Utilities)
- Northampton Boulevard Roadway Modifications to Support Lake Wright East
- Norvella Heights PS46 Service Area Upgrades (Utilities)
- Norvella Heights PS46 FM Replacement (Utilities)
- Norview Community Center Splashpad
- Norview Ramp/I-64 Improvements (VDOT)
O
- Oakwood Park Phase 3 (Utilities)
- Odor Control Modifications for Pump Stations 15, 18 & 23 (Utilities)
- Orange Avenue Drainage
P
- Park Place PS10 Service Area Phase 8 (Utilities)
- Patriots Crossing (VDOT) *printable brochure*
- Passenger Rail Station
- Plan Room/ Invitation for Bids-RFPs
Q
R
S
- Saratoga Neighborhood Water and Sewer Replacement (Utilities)
- Sewells Point Road and Princess Anne Road intersection improvements (VDOT) *Detour Map*
- Slover Library
- Southside Aquatic Center
- Standby Wastewater Bypass Pumps Phases 10 & 11 (Utilities)
T
- Therapeutic Recreation Center Addition
- 35th St. Water and Sewer Upgrade Phases 6 & 7 (Utilities)
- 36th Street Area Gas Line Renewal (VNG)
- Tidewater Drive and E. Little Creek Road Underpass Reconstruction
- Tidewater Drive 16 Water Main Replacement (Utilities)
- Tidewater Drive 16 Water Main Replacement – Thole Street (Utilities)
- Tidewater Drive 20 Water Main Replacement – Philpotts Road (Utilities)
- Titustown PS 34 Service Area Phase 1 (Utilities)
- Titustown PS 34 Service Area Phase 2 (Utilities)
- Titustown PS 34 Service Area Phase 3 (Utilities)
- 26th Street and Monticello Avenue Signal Improvements
U
V
- Villa Heights Lindenwood PS8 Phase 6 (Utilities)
- Wards Corner Sewer Replacement Phase 2 (Utilities)
- Wards Corner Wastewater Pump Station Phase 1 (Utilities)
- Waterside Drive Streetscape Improvements
- Wesleyan Drive Widening (joint project with the City of Virginia Beach)
- West Ocean View – Northside Water & Sewer Replacement Phase 1 (Utilities)
- West Ocean View Northside Phase 2 (Utilities)
- Winona Sewer Improvements (Utilities)
Y
Z
Projects sorted by Neighborhood/Planning District
For detailed project information, click on the following links:
Ballentine Place
Campostella
Chesterfield Heights
- Chesterfield Heights Sanitary Sewer Upgrade Phase 1B (Utilities)
- Chesterfield Heights Wastewater Pump Station Phase 1A (Utilities)
City - Wide
- ARRA (Stimulus) Resurfacing Program
- Consolidated Courts Complex
- Passenger Rail Station
- Standby Bypass Pumps
- Resurfacing Program (FY11)
- Resurfacing Program (FY12)
- Slover Library
- Zoo Animal Wellness Center
- Coleman Place Drainage Improvements
- Sewells Point Road and Princess Anne Road intersection improvements (VDOT) *Detour Map*
Colonial Place
- Colonial Place/Riverview Area Pipeline Replacement (HRSD)
- Haven Creek Living Shoreline
- Riverview Area Pipeline Replacement (HRSD)
Commodore Park
Downtown
- Brambleton Avenue project
- Downtown Tunnel Ceiling Panel Replacement
- Downtown Tunnel/Midtown Tunnel/MLK Extension (VDOT)
- Half Moone Cruise and Celebration Center Mooring Dolphin
- Slover Library
- U.S.S. Wisconsin
- Waterside Drive Streetscape Improvements
Edgewater
Fairmount Park
- Fairmount Park Phase 8 (Utilities)
- Fairmount Park Phase 9 (Utilities)
Ghent
Glenrock
Huntersville
- Huntersville Water and Sewer Replacement Phase 3 (Utilities)
- Huntersville Water and Sewer Replacement Phase 5 (Utilities)
Industrial Park
Ingleside
Kempsville
Lafayette
Lake Taylor
- Northampton Boulevard Roadway Modifications to Support Lake Wright East
- Lowery Road Signal
- Wesleyan Drive Widening (joint project with the City of Virginia Beach)
Lamberts Point/ODU
- Lamberts Point Shoreline Protection Project
- 35th St. Water and Sewer Upgrades (Utilities)
- Bluestone Area Gas Line Renewal (VNG)
- W 44th Street Area Gas Line Renewal (VNG)
- Lindenwood Water and Sewer Replacement Phase 4 (Utilities)
- Villa Heights Lindenwood PS8 Phase 6 (Utilities)
- Fort Norfolk - Brambleton and Colley Aves
- Fort Norfolk - Southampton Ave
- Midtown Tunnel/Downtown Tunnel/MLK Extension (VDOT)
- Wesleyan Drive Widening (joint project with the City of Virginia Beach)
- Norvella Heights PS46 Service Area Upgrades (Utilities)
- Bayview Water and Sewer Upgrade Phase 3 (Utilities)
- Bayview - Cottage Line Water and Sewer Replacement Phase 4 (Utilities)
- W 36th Street Area Gas Line Renewal (VNG)
- Monticello Avenue and 26th Street Signal Improvements
- Morton Avenue Area Gas Line Renewal (VNG)
- Park Place PS10 Service Area Phase 8 (Utilities)
- Titustown (Pump Station 34) Service Area (Utilities)
- Villa Heights Lindenwood PS8 Phase 6 (Utilities)

