Brambleton Bridge Assessment Photo Gallery
Click the navigation buttons to advance the slide show. Click on the photo for more options.

 Previous ImageBack to Image ListNext Image

 DATE:  September 11-12, 2006

Approach Sidewalk - Abutment #A – South Side

½”x 12’ longitudinal crack is noted on approach sidewalk with 3”x 10” chipped asphalt curb also noted on south sidewalk relief at abutment #A expansion joint.