THE CITY OF NORFOLK MODIFICATIONS TO HRPDC REGIONAL STANDARDS, 4th Edition 
         
Section Sub-Section Name Add/
Delete
Modification
All Sections   Measurement for Payment.   Replace See Appendix D for City of Norfolk Department of Utilities Measurement and Payment Item Descriptions.  Replace all references to Mesaurement for Payment in the technical specifications with Appendix D.
102 VII Standard Bid Items and Units Delete Use City of Norfolk Measurement and Payment descriptions. Refer to Appendix D.
All 100 sections   General Provisions Replace Revise all HRPDC General Provisions with Norfolk City Modifications and Department of Utilities Modifications
200 II.2.2 Quality Assurance Add International Plumbing Code                                                                                                                                                                                                                                                                               Norfolk Arboricultural Specifications and Standard Practice Manual
  III.3.2 Submittals Modify In first line delete letter “r” from word “manufacturer”. 
  III.3.6 Submittals Add Add the following sentences: “Requests for substitutions shall be submitted at the pre-construction meeting and must be approved in writing by the Engineer prior to the start of any construction.”
  V.5.1.C Aggregate Add Insert  “of this document” after “Division 8 activities” and before the comma.
  V.5.10.A.2 Casing Pipe Modify In second line after word “be” add word “in”.
  V.5.10.A.9 Ductile Iron Pipe Add Ductile Iron pipe shall have Sewpercoat calcium aluminate lining, Protecto 401 ceramic epoxy lining, or equal hydrogen sulfide resistant lining approved by the Department.
  V.10.B.5 PVC Pipe Modify Correct the second sentence to read: “When Compact fittings are used, they shall have a minimum acceptable pressure rating of 350 psi.”
  V. 5.10.D. HDPE Pipe Add HDPE pipe may only be used with prior written approval by the Department.
  V.5.10.E.1.a.  Valves Add All gate valves for sewer shall open left (counterclockwise).
  V.5.10.E.1.c.  Valves Delete Delete “with threaded connections” from the first sentence.
  V.5.10.E.1.d. Valves Add Accessories:  Provide zinc plated bonnet bolts, studs and nuts for unsubmerged service.  Provide stainless bonnet bolts, studs and nuts for submerged service.  Make wedging devices bronze to iron or bronze to bronze.  Provide glands which are bronze or bronze bushed and bronze gland bolts and nuts.
  V.5.10.E.3  Valve Operators Delete “A valve key wrench of adequate length and of each type required shall be provided for each project.”
  V.5.10.E.4. Valve Stem Extensions Delete Strike out section 
200 V.5.10.E.5. Check Valves Add Provide single disc swing check valves designed to allow a full diameter passage and to operate with a minimum loss of pressure.  Provide 1/8 through 3 inch check valves that meet the requirements of MSS SP-80.  Provide 4 inch through 24 inch check valves that meet the requirements of AWWA C508.  Equip check valves with bronze renewable seat rings, bronze discs or disc rings and bronze disc hinge bushings and pins.  Carefully mount discs and provide discs that swivel in disc hinges.  Provide pins, discs and other parts that are noncorrosive, nonsticking and properly cured to operate satisfactorily within a temperature range of 34 to 100 degrees Farenheit and with the fluids specified.  Equip 6 inch and larger check valves with outside levers and weights.  Provide check valves manufactured by American Flow Control, Clow Valve, M&H Valve, Mueller Valve, or approved equal.
  V.5.10.G.3.c Joint Restraint Devices Add Harnessing:  For ductile-iron pipe and fittings with mechanical joints that require harnessing, provide ductile-iron mechanical joint retainer glands.
  V.5.10.G.4.c Joint Restraint Devices Add Harnessing:  For PVC joints requiring harnessing, provide Series 1300/1390 restraining fittings as manufactured by Uni-flange, Corp., Series 1110 HV and Series 2000 PV as manufactured by EBAA Iron Sales, Inc., or equal.
  V.5.10.G.5.a Joint Restraint Devices Modify After word “accordance” add word “with”.
  V.5.11.A.5 Ductile Iron Pipe Fittings Modify Correct the second sentence to read: “When Compact fittings are used, they shall have a minimum acceptable pressure rating of 350 psi.”
  V.5.11.A.8  Ductile Iron Pipe Fittings Add After ANSI/AWWA add “Current department approved linings include Sewpercoat calcium aluminate lining and Protecto 401 ceramic epoxy lining.  Other hydrogen sulfide resistant linings shall be submitted for review and approval as equal”.
  V.5.11.B.8  PVC Pipe Fittings Add Add paragraph “For Mains installed, where cover is 10’ (ten feet) or greater, the pipe shall be C900/C905 DR 18 or Ductile Iron.”
  V.5.11.B.9  PVC Pipe Fittings Add Add paragraph “All fittings shall be molded or ductile iron.  No fabricated fittings will be allowed.”
  V.5.11.C. ABS or PVC Composite Pipe and Fittings Delete Strike out section 
  V.5.19.A.5 Ductile Iron Pipe fittings Modify Correct the second sentence to read:  " When Compact fittings are used, they shall have a minimum acceptable pressure rating of 350 psi."
  V.5.19.B.3.  PVC Pipe Delete “couplings, and fabricated fittings” and “or fitting”.
  V.5.19.B.6 PVC Pipe Add Add as the final sentence in the paragraph:  "Where Schedule 80 PVC is used, solvent cement shall meet the requirement of ASTM D-2564."
  V.5.19.B.7. PVC Pipe Delete Strike out paragraph 
  V.5.19.E Copper Water Pipe Delete Strike the sentence that starts, “Fittings shall be wrought…”
  V.5.19.F.1.c.  Valves Delete Strike out “with threaded connections”.
  V.5.19.F.1.d.  Valves Add All gate valves for water shall open right (clockwise).
  V.5.19.F.2.a Butterfly Valves Modify Replace “16 inches” with “20 inches”.
200 V.5.19.F.4.  Valve Operators Modify Strike out the sentence that begins, “A valve key wrench…” Add the following: “NOTE: Water valves open right (clockwise).”
  V.5.19.F.5. Valve Stem Extensions Delete Strike out paragraph 
  V.5.19.H.2.  Fire Hydrants Delete "The fire hydrant shall be painted with a high gloss, alkalyd industrial enamel (colors to be selected by Owner)".
  V.5.19.H.3 Fire Hydrants Delete Strike out paragraph 
  V.5.19.H.6 Fire Hydrants Delete Strike out paragraph 
  V.5.19.H.7 Fire Hydrants Add "All fire hydrants shall be manufactured in complete accordance with American Water Works Association Specification C502, latest revised edition, and shall be as manufactured by the Darling Valve & Manufacturing Company (Model B-50-B), Mueller Centurian A-421, Pacer Model W-67, Kennedy K-81, or approved equal.  Hydrants shall have full 360 degree revolving heads and shall open by turning the operating nut to the right (clockwise).
  V.5.19.I.5 Service Saddle Modify In first sentence insert word “main” after word “water”.
  V.5.19.J.1 Water Meters Delete “meter yoke”.
  V.5.19.K.4.a.  Concrete Reaction Blocking Add Add the phrase, ", or as designated by the Engineer," after the word, "Drawings".
  V.5.19.K.4 Concrete Reaction Blocking Delete subsections b and c
  V.5.19.L.2.  Tapping Valves and Sleeves Delete Strike out the sentence, “The valves shall be subjected to a factory test…”
  V.5.19.L.3.a.  Tapping Sleeves for DI Pipe and PVC C-900 Modify In the first sentence insert “full bodied” between “shall be” and “mechanical joint”.  Delete “in accordance with ANSI/AWWA C110/A21.10. and” from the sentence beginning with “Tapping sleeves shall be…”
  V.5.19.L.3.b.  PVC pipe (Other than C-900) Delete Strike out the first paragraph, which begins, “Tapping sleeves shall be complete…”
  V.5.20.B.  Subsurface Utility Warning Tape Modify Replace “metalized” with “non-metallic”.
  V.5.21.B.6.d Wall Thickness Modify Last word in 6th line should be “of” instead of “or”.
  V.5.21.F.1 Manhole Rehabilitation Using Cementious Products Delete Delete entire section
  V.5.21.I.2 Manhole Frame Seals Delete After "only be installed with" delete " the cementious lining and"
303 II.2.2.B.5  Trenching, Backfilling, and Compaction Modify Re-write the last sentence to read ”In such instances, sheeting will be cut off at least two (2) feet below finished grade and left in place.”
303 II.2.2.E.1  Trench Bedding and Backfilling Modify Replace “Contractor” with “Inspector”.
  II.2.2.E.4.  Trench Bedding and Backfilling Modify Replace the paragraph with: “Backfill material shall be solidly compacted around the pipe in 6” layers up to sub-base of the roadway or the existing ground elevation.  As a minimum, compact each layer of the backfill material to 95% maximum density as determined in accordance with VTM-1.  
   II.2.2.E.7.  Trench Bedding and Backfilling Modify Replace in the first sentence, "...material to not less than the following percentages at the maximum…" with "…material to 95% maximum…".
   II.2.2.E.7.  Trench Bedding and Backfilling Delete  sub sections “a – c”.
  II.2.2.E.7.e.  Trench Bedding and Backfilling Add  “The City may, at any time, require compaction testing to ensure compliance with the specifications.  A recognized testing laboratory that is selected by the City will conduct all tests.  The testing laboratory is to be qualified in the field of the materials to be tested.  If applicable, all tests will be conducted in accordance with V.D.O.T.’S “Manual for Virginia Testing Methods”  (Current Edition, as Revised).  Payment for all tests will be in accordance with the following:                                                                                                           A) The cost of all tests failing to meet the minimum requirements will be borne by the Contractor.                                                                                                                    B) The costs of all tests that either meet or exceed the minimum requirements shall be borne by the City.
  II.2.2.G.2.  Pavement Removal for Placement of Pipelines Modify Replace the sentence beginning with “The minimum requirements for a ….” with ”Temporary paving shall be installed and maintained to provide a suitable driving surface on residential streets.  Contractor shall allay dust.  Daily temporary pavement may be recycled asphalt, crushed concrete, cold mix asphalt patch or VDOT 21A Stone.  The inspector has the final decision of the acceptability of temporary paving”.  This item shall be included in the L.F. cost of the main.
  II.2.3.  Tolerances Delete Complete Section
801 II.2.2.C.7.  Pipe Installation Modify Replace “300” with “100”
  II.2.2.F.  Tracer Wire Modify Replace “attached every 10 feet to” with “1 foot above”.
  II.2.2.G.  Subsurface Utility Tape Modify Re-write the paragraph to read,” All non-metallic water mains shall be identified by a subsurface non-metallic utility warning tape placed at an elevation of 12” above the copper tracer wire or as directed by the owner, conforming to Section 200.”
  II.2.3.A.  Valve Installation Modify After “direction of openings” insert the following, “(All water valves open right)”.  Re-write the second sentence to read, ”Valves found not opening to the right, or determined to be defective by the Owner shall be rejected, removed from the site, and replaced by the Contractor at no additional cost to the Owner.”
  II.2.6.C.  Restraint Add After “…coating” add the following, “or as directed by the Owner.”
  II.2.7.C.  Connections to Existing Mains Delete  Delete the sentence that begins with, “Connection shall be…”.  
  II.2.7.F.4  Connections to Existing Mains Modify Replace the paragraph with, "Tie-ins to existing mains shall only be performed after the new main has been satisfactorily pressure tested and chlorinated.  The contractor may not tie-in the new main to the existing main until after the results of the bacteriological tests have been completed and approved by the owner."
801 II.2.7.G.  Tapping Existing Mains Under Pressure Delete Delete subsections 3,4, and 6.
  II.2.7.G.5.  Tapping Existing Mains Under Pressure Modify Change the sentence to read, "Pressure shall be maintained for one (1) hour period without evidence of leakage."
  II.2.7.G.7.   Tapping Existing Mains Under Pressure Add In the first sentence, after “…branch are acceptable” add the following, “unless otherwise directed by the Owner.”
  II.2.8.B.1.  Pressure Test Modify In the sentence which begins, “Water mains shall be…” remove the portion that states, “1.5 times the expected working pressure or” and the portion that states, “,whichever is greater”.  
  II.2.8.B.3.  Pressure Test Add  “, or as directed by the Owner.”
  II.2.8.B.8.  Pressure Test Modify Replace this subsection with, “The test pressure shall be maintained at the pressure stated in the project specifications throughout the duration of the test period.  The water used to maintain the test pressure shall be measured and shall be less than the allowable leakage in order for the main to have passed the test.”
  II.2.8.B.10.  Pressure Test Modify After “…restraint and support” insert “ for testing apparatus”.
  II.2.8.C.2.  Leakage Test Modify Insert the word “excess” between “…until the” and “leakage.”
802 II.2.1.E. General Add Provide cut sheets for all manholes, 100 ft. stations and end-of-line cleanouts.
  II.2.1.F. General Add All Services which are reconnected to the replaced sewer main shall be shown on the "As Built" drawings with the exact distance from the nearest manhole and with the details of the method of reconnection.
  II.2.2.C.4. Pipe Laying Add "If a swab is in the pipe for cleaning, the grade shall be checked and recorded for each joint of pipe.
  II.2.2.C.6 Pipe Laying Modify After"…shall be closed" insert " by use of a temporary bulkhead" and delete " to the satisfaction of the Owner".
  II.2.2.D.1. Alignment and Grade Modify Replace "Drawings" with "approved laying schedule".
  II.2.2.D.2. Alignment and Grade Delete Entire subsection
  II.2.3.B. Manhole Installation Add To the end of the second sentence after: non-shrink grout-"and coated to match surfaces of manholes."
  II.2.4.A.2. Testing and Inspection Modify Change the sentence to read, "The Contractor shall submit to the Owner, at least 48 hours in advance, any requests to schedule testing and inspection."
  II.2.4.B.1.a. (5). Pipe Testing - Gravity Lines Add "Contractor is responsible for uncovering and restoring spot check sites at no additional cost to the Owner."
  II.2.4.B.1.a. (8) Pipe Testing - Gravity Lines Modify Replace the last sentence with, "See Section 811."
  II.2.4.B.1.c.2.d Remote Camera / TV Inspection Modify Bottom of page “d” should be (3).  Paragraph at top of page – In second line change word “one” to “line”.
802 II.2.5.B Connections Modify In parentheses should read (where stubs are bricked up or openings do not exist). 
  II.2.5.B Connections Modify In third line change to Final Completion.
803 II.2.2.F Tracer Wire Modify Replace "attached every 10 feet to" with " 1 foot above".
  II.2.2.G Subsurface Utility Tape Modify Re-write the paragraph to read "All non-metallic water mains shall be identified by a subsurface non-metallic utility warning tape placed at an elevation of 12" above the copper tracer wire or as directed by the Owner, conforming to Section 200."
  II.2.3.A Valve Installation Modify After "direction of openings" insert the following;  "(All sanitary sewer valves open left)".  Re-write the second sentence to read "Valves found not opening to the left, or determined to be defective by the Owner shall be rejected, removed from the site, and replaced by the Contractor at no additional cost to the Owner."
  II.2.6.5.J.11 Offsets to Existing Force Main Modify In third line, replace water main with force main.
804 II.2.1.D Boring and Jacking execution Modify In second line delete “r” from word manufacturer. Change word “or” to “of”.
805 I.1.2.B.2 Unusual Conditions Modify Replace the second half of the sentence that begins, “pressure tested in place…” and ends “…and tested in place.”  with, “, and meets current Virginia Department of Health Sewage Collection and Treatment Regulations.”
810 II.2.2.F.3 Acceptance of Cleaning Operation Add  A television inspection shall be completed after cleaning to verify that the cleaning operation was successful.  The television inspection shall be in accordance with Section 811 - Television Inspection.
811 I.1.2.A. Submittals Add "Video Tapes shall be Extra High Grade T-120 VHS videotape for all television surveys.  All taping shall be performed as SP (Standard Play, 2hrs/tape). All video shall be submitted to the Owner and will become the property of the Owner.  Two labels are requried, with one label placed on the video and the other on the container.  Permanently label each video with the following information: Owner Name, Contractor Name, Tape No., Date Televised, Date Submitted, Project Name, Branch Name, Street Name; Manhole No. From, Manhole No. To, Pipe Diameter, Pipe Length, Street Name."
  I.1.2.D. Submittals Add Overflow Prevention Plan
  I.1.2.E. Submittals Add Overflow Containment and Cleanup Plan
  II.2.1.B.1. Equipment Add Sewer scanner and evaluation technology, similar to the Blackhawk pipeline assessment system, is an acceptable alternative to CCTV.
  II.2.2.A.2. Flow Control Modify The end of the last sentence to read, "…unless approved by the Owner in advance".
812 I.1.2.P. Submittals Add Overflow Prevention Plan
  I.1.2.Q. Submittals Add Overflow Containment and Cleanup Plan
Standard Details RC_02 Utility Locations Delete  
  EW_02 Payment Limits Trench Excavation and Backfill Delete  
  EW_03 Trench Width Detail for Payment of Contingent Items Delete  
  CI_08 Residential Entrance w/out Curb and Gutter Delete Use Norfolk Public Works/Codes Standard Driveway Entrance Detail
  WD-01 Dual Service Connection Delete Dual Service connection not allowed.
  WD_02 Water Service Installation Detail Replace Use the Norfolk Standard Detail for Typical Tap Installatioin, CW 01
  WD-03 Water Meter Box (Type I) Replace Use the Norfolk Standard Detail for Water Meter Box & Cover, CW 02
  WD_04 Water Meter Box (Type II) Delete  
  WD_05 Blow Off Assembly Replace Use the Norfolk Standard Detail for Air Vent/ Blow-Off Valve, CWS 03
  WD_06 Fire Hydrant Setting (TypeI) Replace Use the Norfolk Standard Detail for Fire Hydrant Installation, CW 04 and Fire Hydrant Connection, CW 05.
  WD _07 Fire Hydrant Setting (Type II) Delete  
  WD _08 Fire Hydrant Setting (Type II) Delete  
  WD_09 Temporary Manifold For Test and Chlorination Delete  
  WD_10 Precast Concrete Vault - Non-Load Bearing Delete  
  WD_11 Precast Concrete Vault - H20 Loading Delete  
  WD_12 Metal Meter Vault Delete  
  WS _01 Standard Valve Box Frame and Cover Delete Use the Norfolk Standard Detail for Large Valve Box Frame and Cover, CWS 01 and CWS 02 for Small Valve Box Frame and Cover.
  WS _02 Valve Setting Detail Delete  
  WS _03 Manual Air Vent Assembly Replace Use the Norfolk Standard Detail for Air Vent/ Blow-Off Valve, CWS 03
  WS_04 Steel Casing Detail Replace Use the Norfolk Standard Detail for Water Line Casing, CWS 07A and CWS 07B
  WS _05 Standard Thrust Blocks Delete  
  WS _06 Obstruction By-Pass Uniform Offset Delete  
  WS _07 Restraining Rod Detail Delete  
  SS_01 Standard Precast Concrete Manhole w/Extended Monolithic Base Replace Use Norfolk Standard Detail for Standard Precast Sewer Manhole, CS 03
  SS_02 Precast Concrete Shallow Manhole Replace Use Norfolk Standard Detail for Shallow Precast Sewer Manhole, CS 04
  SS_03 Sanitary Sewer Straddle Manhole Delete  
  SS_04 Sanitary Sewer Interior Drop Manhole Replace Use Norfolk Standard Detail for Standard Precast Sewer Drop Manhole, CS 05
  SS_05 Sanitary Sewer Exterior Drop Manhole (For Existing Manhole Only) Replace Use the Norfolk Standard Detail for Standard D.I. Drop Connection for Existing Brick Manhole, CS 01
  SS_06 Sanitary Sewer Manhole Adjustment  Delete  
  SS_07 Sanitary Sewer Manhole Invert Shaping Delete  
  SS_08 Connection into Existing Manhole Delete  
  SS_09 Sanitary Sewer Manhole Casting (24") Delete  
  SS_10 Sanitary Sewr Manhole Cover (24") Delete  
  SS_11 Saniary Service Lateral Clean Out Frame and Cover Replace Use Norfolk Standard Detail for Mainlline Cleanout Casting and Cover, CS 10
  SS_12 Sanitary Service Lateral Clean Out Frame and Cover For Heavy Loads Delete  
  SS_13 Sanitary Sewer Main Line Clean Out Box Replace Use Norfolk Standard Detail for Mainlline Cleanout Casting and Cover, CS 10
  SS_14 Sanitary Sewer Service Connection Replace Use Norfolk Standard Detail for Typical Wye/Lateral Layout and Property Line Cleanout, CS 11
  SS_15 Dual Sanitary Sewer Service Connections Delete Dual Service connection not allowed.
  SS_16 Deep Sanitary Sewer Service Connection Delete  
  SS_17 Force Main Saxophone Replace Use the Norfolk Standard Detail for Force Main Saxophone, CS 14
  SS_18 Force Main to HRSD Force Main Delete