About Norfolk
 
Search
 
 
 
Utilities - Engineering  

 

Construction Projects in your Neighborhood

Updated January 2012

Capital Improvement Projects

Through a Capital Improvement Program (CIP) the Department of Utilities builds, maintains and improves the City’s water and sewer infrastructure, which includes a vast networks of pipes, pump stations, treatment plants and storage facilities. When prioritizing needed projects, the City considers a number of factors including the system’s age, current condition and the number of reported repairs or failures. Through long range planning, the City evaluates future needs; however specific CIP budgets and project plans are adopted each year on a one-year appropriation basis. The public plays an important role throughout the annual CIP process by attending City work sessions and public input forums. To discuss water and sewer CIP programs please contact the Department of Engineering at 757-664-6701.

{CLICK HERE} If you would like graphical information about where Utilities projects are occuring. This software requires Adobe Flash 10  To download a free copy of Adobe Flash 10 click here.

Current Projects

Bayview Water and Sewer Replacement Phase 3

Bayview and Cottage Line Water and Sewer Replacement Phase 4

Chesterfield Heights Sanitary Sewer Upgrade Phase 1B

Chesterfield Heights Wastewater Pump Station Phase 1A

Fairmount Park Phase 8

Fairmount Park Phase 9

Huntersville Water and Sewer Replacement Phase 5
Moores Bridges WTP Upgrades
Mowbray Arch Water and Sanitary Sewer Construction Phase 1
Norvella Heights PS46 Upgrades
Odor Control Modifications for Pump Stations 15, 18 & 23
Park Place PS10 Service Area Phase 8
Saratoga Neighborhood Water and Sewer Replacement
Villa Heights Lindenwood PS8 Phase 6
West Ocean View – Northside Water & Sewer Replacement Phase 1
 
 
 
 
 
 

Upcoming Projects

Bayview and Cottage Line Water and Sewer PS23 Service Area PER

Bayview and Cottage Line Water and Sewer PS23 Service Area PH1

Bayview Water and Sewer Replacement Phase 5

Botetourt Street Wastewater Pump Station 151 Design

E Ocean View PS88 Phase 1

Fairfax Avenue Water and Sanitary Sewer Design

Fairmount Park Phase 10

Lochaven and Larchmont Wastewater PS109 Flood Control Design

Lochaven and Larchmont Wastewater PS112 Flood Control Design

Lochaven and Larchmont Wastewater PS113 Flood Control Study

Lochaven and Larchmont Wastewater PS114 Flood Control Design

Mowbray Arch Water and Sanitary Sewer Design Phase 2

Norvella Heights and Brandon Place PS46 Force Main Replacement

Wards Corner Sewer Replacement Phase 2

Wards Corner Wastewater Pump Station Phase 1

West Ocean View – Northside Phase 2

 
 

 

For a listing of all City of Norfolk Construction Projects, view Norfolk’s Tips on Traffic Report. (http://www.norfolk.gov/publicworks/tipreport.asp)

 We are here to serve you!  

EMERGENCY NUMBERS:
Water or Sewer Main Breaks (757) 823-1000
Customer Service (757) 664-6700
Miss Utility (Call Before You Dig)
1-800-552-7001


 
|
|
|
 
810 Union Street, Norfolk, VA. 23510 757-664-4000