Project Information

Granby Street Bridge Rehabilitation Location

Lafayette River between E 42nd Street and Willow Wood Drive (over Lafayette River)

Project Information

This project will improve the condition of the Granby Street Bridge by repairing key structural components and protecting bridge elements from deterioration.

Scope of Work

  • New latex modified concrete deck overlay
  • Repair structural components
  • Seal and waterproof bridge
  • Replace new elastometric bearings and expansion joints
  • Reconstruct portions of roadway and sidewalk at bridge approaches

Project Status

  •  Under design review

Project Schedule

  • Estimated construction start date: Mid 2020
  • Estimated construction completion date: Late 2022

Project Cost

Under design review

Construction Impacts

  • Lane closures will be required; at least one lane in each direction will be open at all times
  • One of the two existing sidewalks will be open at all times
  • The bike lane over the Granby Street Bridge will be temporarily closed during construction

Neighborhood Civic Leagues

  • Riverpoint Civic League
  • Colonial Place/Riverview Civic League

Updated May 13, 2020